Motorola MVME2700 Series Servisní příručka Strana 23

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 215
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 22
Equipment Required
http://www.motorola.com/computer/literature 1-3
1
Equipment Required
The following equipment is required to complete an MVME2700 system:
VME system enclosure
System console terminal
Operating system (and/or application software)
Disk drives (and/or other I/O) and controllers
Transition module (MVME712M or MVME761) and connecting
cables
MVME2700 VME modules are factory-configured for I/O handling via
either MVME712M or MVME761 transition modules.
Overview of Startup Procedure
The following table lists the things you will need to do before you can use
this board and tells where to find the information you need to perform each
step. Be sure to read this entire chapter, including all Caution and Warning
notes, before you begin.
Table 1-1. Startup Overview
What you need to do... Refer to...
Unpack the hardware. Unpacking Instructions on page 1-5
Configure the hardware by
setting jumpers on the boards
and transition modules.
MVME2700 Base Board Preparation on page 1-6
and MVME712M Transition Module Preparation
on page 1-12 or MVME761 Transition Module
Preparation on page 1-23
Ensure that mezzanine boards
are properly installed.
Hardware Installation on page 1-46, RAM200
Memory Mezzanine; PMC Module; PMC Carrier
Board
Install the MVME2700 VME
module in the chassis.
MVME2700 VME Module Installation on page 1-53
Zobrazit stránku 22
1 2 ... 18 19 20 21 22 23 24 25 26 27 28 ... 214 215

Komentáře k této Příručce

Žádné komentáře